Asset Report

Nkana copper smelter

From

$1,350.00

You can pay by card or invoice

From

$1,350.00

You can pay by card or invoice

Get this Asset Report as part of a subscription

Enquire about subscriptions

Already have a subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

Submit your details to receive further information about this report.

For details on how your data is used and stored, see our Privacy Notice.
 

Report summary

The smelter was commissioned with four reverberatory furnaces in 1932.  A fifth was added in 1952 and all units were enlarged in the late 1950s . By 1961 capacity was 325kt/a.  During the 1980s capacity was eroded to 220kt/a and in 1990 two furnaces were replaced by an oxy-fuel fired unit to regain capacity.  Major commissioning problems were encountered with this furnace.  In August 1994 a Teniente converter was added, again with major commissioning problems. The reverberatory furnaces had...

What's included

This report contains

  • Document

    Nkana copper smelter

    PDF 998.04 KB

  • Document

    Nkana copper smelter.xls

    XLS 381.00 KB

Table of contents

  • Key facts
  • Summary and key issues
  • Location maps
  • Participation
    • Environmental
  • Economic assumptions

Tables and charts

This report includes 8 images and tables including:

Tables

  • Key facts: Table 1
  • Participation: Table 1
  • Feed preparation
  • Smelting process
  • Auxiliary plants
  • Economic assumptions: Table 1

Images

  • Detailed map
  • Flowsheet

You may be interested in

Asset Report

Nkana copper refinery

Asset Report

Nkana copper mine

Asset Report

Nchanga copper smelter

Questions about this report?

  • Europe:
    +44 131 243 4400
  • Americas:
    +1 713 470 1600
  • Asia Pacific:
    +65 6518 0800