Nkana copper smelter

From

$1,350.00

Get this report

From

$1,350.00

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

FAQs

Contact us

Report summary

The smelter was commissioned with four reverberatory furnaces in 1932. A fifth was added in 1952 and all units were enlarged in the late 1950s . By 1961 capacity was 325kt/a. During the 1980s capacity was eroded to 220kt/a and in 1990 two furnaces were replaced by an oxy fuel fired unit to regain capacity. Major commissioning problems were encountered with this furnace. In August 1994 a Teniente converter was added again with major commissioning problems. The reverberatory furnaces had...

What's included

This report contains

  • Document

    Nkana copper smelter

    PDF 544.73 KB

  • Document

    Nkana copper smelter.xls

    XLS 447.00 KB

Table of contents

  • Key facts
  • Summary and key issues
  • Location maps
  • Participation
  • Process overview
  • Economic assumptions

Tables and charts

This report includes 8 images and tables including:

Images

  • Detailed map
  • Flowsheet

Tables

  • Key facts: Table 1
  • Participation: Table 1
  • Feed preparation
  • Smelting process
  • Auxiliary plants
  • Economic assumptions: Table 1

You may be interested in?

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898