Asset report

Nkana copper smelter

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

For further information about this report submit the form below.

Report summary

The smelter was commissioned with four reverberatory furnaces in 1932. A fifth was added in 1952 and all units were enlarged in the late 1950s . By 1961 capacity was 325kt/a. During the 1980s capacity was eroded to 220kt/a and in 1990 two furnaces were replaced by an oxy fuel fired unit to regain capacity. Major commissioning problems were encountered with this furnace. In August 1994 a Teniente converter was added again with major commissioning problems. The reverberatory furnaces had...

What's included

This report contains

  • Document

    Nkana copper smelter

    PDF 545.52 KB

  • Document

    Nkana copper smelter.xls

    XLS 447.50 KB

Table of contents

  • Key facts
  • Summary and key issues
  • Location maps
  • Participation
  • Process overview
  • Economic assumptions

Tables and charts

This report includes 8 images and tables including:

Images

  • Detailed map
  • Flowsheet

Tables

  • Key facts: Table 1
  • Participation: Table 1
  • Feed preparation
  • Smelting process
  • Auxiliary plants
  • Economic assumptions: Table 1

You may be interested in

Asset report

North Mara gold mine

Asset report

Buzwagi gold mine

    
            
            
            
            
            
            
            
    

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898