Asset report

NuevaUnion copper mine project

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

Contact us about this report

Report summary

Corridor Project comprises Relincho and El Morro copper projects. Relincho is located at 1 500 masl and 130 km from the Huasco Port. El Morro is located at 4 000 masl and 40 km SE from Relincho. The combination of these two mine projects includes a conveyor belt to transport ore from El Morro to Relincho where a single mill will treat ore from both pits. The project will have a single tailings facility located at Relincho and will share a desalination plant energy plant and port.

What's included

This report contains

  • Document

    NuevaUnion copper mine project

    XLS 516.50 KB

  • Document

    NuevaUnion copper mine project

    PDF 5.94 MB

Table of contents

  • Key facts
  • Summary and key issues
  • Location maps
  • Participation
  • Geology
  • Reserves and resources
  • Infrastructure
  • Costs
  • Operations
  • Fiscal and regulatory
  • Timeline

Tables and charts

This report includes 5 images and tables including:

Images

  • Detailed map

Tables

  • Key facts: Table 1
  • Key facts: Table 2
  • Reserves and resources: Table 1
  • Reserves and resources: Table 2

You may be interested in

    
            
            
            
            
            
            
            
    

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898