Asset report

Oksut gold mine project

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

For further information about this report submit the form below.

Report summary

The Öksüt project is 100% owned by Centerra Gold Inc. through their subsidiary Öksüt Madencilik Sanayi ve Ticaret A.S. (OMAS). The deposit will be mined over eight years with average annual gold production of 110koz. Mining will be from two open pits with the ore treated via heap leaching. Pre-development capital is US$221 million. The Öksüt project is made of two open pits, Keltepe and a smaller pit, Güneytepe. Mineral reserves, as of June 2015, stand at 26.1Mt grading 1.4g/t Au for a total of 1.2Moz. This ore is planned to be mined and stacked in a conventional heap leach with an 11kt/d leaching capacity.

What's included

This report contains

  • Document

    Oksut gold mine project

    XLS 121.50 KB

  • Document

    Oksut gold mine project

    PDF 1.01 MB

Table of contents

Tables and charts

This report includes 2 images and tables including:

Images

  • Location maps: Image 1

Tables

  • Key facts: Table 1

You may be interested in

    
            
            
            
            
            
            
            
    

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898