Asset Report

O'Okiep copper smelter

From

$1,350.00

You can pay by card or invoice

From

$1,350.00

You can pay by card or invoice

Get this Asset Report as part of a subscription

Enquire about subscriptions

Already have a subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

Submit your details to receive further information about this report.

For details on how your data is used and stored, see our Privacy Notice.
 

Report summary

The O'okiep smelter was commissioned in 1939 and is a small reverberatory furnace based smelter without anode casting or acid plant facilities.  In the past the smelter treated O'okiep concentrates and Prieska concentrates.  The Prieska material was replaced with Foskor concentrate, small tonnages of other South African concentrates and, in 1992, with imported concentrate due to a substantial reduction in Foskor receipts.  Limited availability of imported concentrates during 1993 to 1995...

What's included

This report contains

  • Document

    O'Okiep copper smelter

    PDF 631.05 KB

  • Document

    O'okiep copper smelter.xls

    XLS 442.50 KB

Table of contents

  • Key facts
  • Summary and key issues
  • Location maps
  • Participation
    • Environmental
  • Economic assumptions

Tables and charts

This report includes 8 images and tables including:

Tables

  • Key facts: Table 1
  • Participation: Table 1
  • Feed preparation
  • Smelting process
  • Auxiliary plants
  • Economic assumptions: Table 1

Images

  • Detailed map
  • Flowsheet

You may be interested in

Asset Report

Tsumeb copper smelter

Asset Report

Gaspe copper smelter

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898