Asset Report

Pakrut gold mine project 

From

$1,350.00

You can pay by card or invoice

From

$1,350.00

You can pay by card or invoice

Get this Asset Report as part of a subscription

Enquire about subscriptions

Already have a subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

Submit your details to receive further information about this report.

  • An error has occurred while getting captcha image
For details on how your data is used and stored, see our Privacy Notice.
 

Report summary

Pakrut is an underground operation utilising cut and fill open stoping mining method.  Initial planned mining capacity is estimated at 660kt/a increasing to 1.32Mt/a. Ore will be processed through a gravity and flotation circuit, with cyanide leaching of both concentrates. Gold production is expected to average around 100 thousand ounces per annum over the first 10 years. Trial production commenced in October 2015 and first gold pour was achieved in December the same year. 

What's included

This report contains

  • Document

    Pakrut Project gold mine

    XLS 130.00 KB

  • Document

    Pakrut gold mine project

    PDF 1.00 MB

Table of contents

Tables and charts

This report includes 2 images and tables including:

Tables

  • Key facts: Table 1

Images

  • Detailed map

You may be interested in

Asset Report

Dolores gold mine

Asset Report

Mulatos gold mine

Asset Report

Morila gold mine

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898