Asset report

Pakrut gold mine project

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

For further information about this report submit the form below.

Report summary

Pakrut is anticipated to be an underground operation utilising cut and fill open stoping mining methods. Initial planned mining capacity is estimated at 660kt/a increasing to 1.32Mt/a. Ore will be processed through a gravity and flotation circuit with cyanide leaching of both concentrates. Gold production is expected to average around 100 thousand ounces per annum over the first 10 years. Trial production commenced in October and first gold pour was achieved in December.

What's included

This report contains

  • Document

    Pakrut Project gold mine

    XLS 130.00 KB

  • Document

    Pakrut gold mine project

    PDF 1.00 MB

Table of contents

Tables and charts

This report includes 2 images and tables including:

Images

  • Detailed map

Tables

  • Key facts: Table 1

You may be interested in

    
            
            
            
            
            
            
            
            
            
            
    

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898