Asset report

Pinson Preble gold project

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

For further information about this report submit the form below.

Report summary

A mine operating permit exists for underground mining allowing 36.5kt of ore to be mined per year. The mine is located along strike to the south-west of the Getchell and Twin Creeks operations. The operation is assumed to be on care and maintenance following the Q4 2015 bankruptcy filing from Atna Resources.

What's included

This report contains

  • Document

    Pinson Preble gold mine

    XLS 128.00 KB

  • Document

    Pinson Preble gold project

    PDF 578.82 KB

Table of contents

Tables and charts

This report includes 2 images and tables including:

Images

  • Detailed map

Tables

  • Key facts: Table 1

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898