Asset Report

Pinson Preble gold project

Get this report

$1,800

You can pay by card or invoice

Contact us

Submit your details to receive further information about this report.

For details on how your data is used and stored, see our Privacy Notice.
 

- Available as part of a subscription
- FAQ's about online orders

29 March 2018

Pinson Preble gold project

Report summary

Pinson comprises open-pit and underground mining targets. The mine is located along strike to the south-west of the Getchell and Twin Creeks operations. Following its closure in 1998, underground production commenced in 2014 with a mine operating permit allowing 400ktons of ore to be mined per year for off-site processing. High grade ore from Pinson underground mine was trucked 8 miles to Newmont Mining Corp.'s Twin Creeks autoclave for processing. The mine is currently assumed to be under care and maintenance. However, future production is based off the 2014 Pre-Feasibility Study for the development of the MAG open-pit with average annual gold production of 40koz/a over a 6 year mine life. 

Table of contents

Tables and charts

This report includes 2 images and tables including:

  • Key facts: Table 1
  • Detailed map

What's included

This report contains:

  • Document

    Pinson Preble gold mine

    XLS 128.00 KB

  • Document

    Pinson Preble gold project

    PDF 580.19 KB

Other reports you may be interested in

Browse reports by Industry Sector