Asset report

Rey De Plata Restart zinc mine

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

Contact us about this report

Report summary

According to Peñoles a restart of this project is expected for December 2018 and includes an underground mine and a poly metallic 4.5kt/d ore concentrator. We have conservatively assumed the restart will occur in Q1 2019. The capital cost is estimated at US$303 million which includes a dry stacking section for the tailings.

What's included

This report contains

  • Document

    Rey De Plata zinc mine

    XLS 542.00 KB

  • Document

    Rey De Plata Restart zinc mine

    PDF 652.70 KB

Table of contents

  • Key facts
  • Summary and key issues
  • Location maps
  • Geology
  • Reserves and resources
  • Costs
  • Operations
  • Fiscal and regulatory
  • Timeline

Tables and charts

This report includes 2 images and tables including:

Images

  • Detailed map

Tables

  • Key facts: Table 1

You may be interested in

    
            
            
            
            
            
            
    

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898