Metalkol (RTR) SxEw copper mine project
Loading current market price
Report summary
The project involves the re-treatment of oxide tailings produced by the mineral concentrator facility in Kolwezi, which processed high-grade ore from KOV and other nearby mines from 1952 onwards. During the operation of the Kolwezi plant, tailings containing significant amounts of copper and cobalt were discharged into two dams, referred to as Kingamyambo and Musonoi. Kingamyambo, which is a conventional tailings dam, contains 42.3Mt of tailings and reaches a height of 20m.
What's included
This report contains
Table of contents
- Key facts
-
Summary and key issues
- Summary
- Key issues
- Location maps
- Participation
- Reserves and resources
-
Costs
- CAPEX
-
Operations
- Mining
- Processing
- Timeline
Tables and charts
This report includes 3 images and tables including:
Images
- Detailed map
Tables
- Key facts: Table 1
- Reserves and resources: Table 1
You may be interested in
Ikot Abasi aluminium smelter
Friguia alumina refinery
Springs zinc smelter
Questions about this report?
-
Europe:+44 131 243 4699
-
Americas:+1 713 470 1900
-
Asia Pacific:+61 2 8224 8898