Asset report

Roseby copper mine project

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

Contact us about this report

Report summary

The Roseby project is made up of a number of tenements that surround MMG's Dugald River project north east of Mt Isa. A DFS completed in May 2012 shifted focus from the a number of small high grade deposits centred on the Blackard prospect to the larger lower grade Little Eva prospect with additional feed sourced from three small high grade satellite deposits. Xstrata has two separate options over Roseby: The SEEP option and the Roseby Feasibility Project (RFP) option. The SEEP option was...

What's included

This report contains

  • Document

    Roseby copper mine project

    XLS 500.00 KB

  • Document

    Roseby copper mine project

    PDF 450.84 KB

Table of contents

  • Key facts
  • Summary and key issues
  • Location maps
  • Geology
  • Reserves and resources
  • Costs
  • Operations
  • Sales contracts
  • Timeline

Tables and charts

This report includes 2 images and tables including:

Images

  • Detailed map

Tables

  • Key facts: Table 1

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898