Asset report

Runruno gold mine project

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

For further information about this report submit the form below.

Report summary

The ore is refractory and requires flotation to produce gold and sulphide concentrate. The concentrate will be further processed by BIOX technology and then via CIL treatment to produce dore. The Runruno gold molybdenum operation started in 2016 and full production rate of 100koz/a is expected to be achieved in 2018.

What's included

This report contains

  • Document

    Runruno Project gold mine

    XLS 122.50 KB

  • Document

    Runruno gold mine project

    PDF 591.04 KB

Table of contents

  • Key facts
  • Summary and key issues
  • Location maps
  • Geology
  • Operations
  • Costs
  • Timeline

Tables and charts

This report includes 2 images and tables including:

Images

  • Detailed map

Tables

  • Key facts: Table 1

You may be interested in

Asset report

Philex gold mine

Asset report

Didipio gold mine

Asset report

Tembang gold mine

    
            
            
            
            
            
            
            
            
            
            
    

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898