Asset report

Rutherford zinc smelter

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

For further information about this report submit the form below.

Report summary

Horsehead announced in July 2011 that it would build a new 150kt/a zinc smelter using the Zincex technology of T├ęcnicas Reunidas. The smelter would be fed by secondary oxides produced at other Horsehead operations from the recycling of steelworks dusts. In September 2011 they announced that the smelter would be built in Rutherford County North Carolina at a capital cost of US$350M and would commission in Q3 2013. Once the new smelter is fully on line Horsehead will close the Monaca...

What's included

This report contains

  • Document

    Rutherford zinc smelter

    PDF 795.16 KB

Table of contents

  • Key facts
  • Summary and key issues
  • Location maps
    • Location / Transport
    • Conc. Receipt / Storage
    • Roaster
    • Acid Plant
    • Leach Plant
    • Solvent Extraction
    • Tankhouse
    • Casting Plant
    • Residue Disposal
  • Products

Tables and charts

This report includes 3 images and tables including:

Images

  • Location maps: Image 1
  • Flowsheet

Tables

  • Key facts: Table 1

You may be interested in

    
            
            
            
            
            
            
            
            
            
    

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898