Asset Report
Seydisehir aluminium smelter
Report summary
The Eti (or Seydisehir) smelter is a truly integrated operation, with captive mine, refinery and downstream facilities. It was commissioned in 1974 on Konya Province and has a nameplate capacity of 65ktpa. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.
Table of contents
- Summary
- Key issues
- Alumina Source
- Anode Source
-
Power
- Power Type
- Power Source
- Power Supplier
- Power Contract
Tables and charts
This report includes 1 images and tables including:
- Detailed map
What's included
This report contains: