Asset report

Sigma-Lamaque gold mine project

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

Submit your details to receive further information about this report.

  • An error has occurred while getting captcha image

Report summary

Sigma-Lamaque is a past producing mine. Integra Mining plans to restart mining operations at the Lamaque deposit, with plans to process ore at the Sigma mill. A Preliminary Economic Assessment (PEA) on the project was published in April 2017. Mine life is estimated at 10 years with two years pre-production. Most of the necessary infrastructure is already in place and hence, pre-production capex of C$175 million is required.

What's included

This report contains

  • Document

    Sigma-Lamaque gold mine project

    XLS 119.50 KB

  • Document

    Sigma-Lamaque gold mine project

    PDF 467.93 KB

Table of contents

Tables and charts

This report includes 2 images and tables including:

Images

  • Detailed map

Tables

  • Key facts: Table 1

You may be interested in

    
            
            
            
            
            
            
    

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898