Asset report

Silvertip zinc mine project

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

For further information about this report submit the form below.

Report summary

JDS Silver purchased the Silvertip project from Silvercorp in late 2013. Construction of the mine started in December 2015 with full production expected in October 2016. The mine has underground operations and ore will be processed in the former Sa Dena Hes concentrator which has been relocated to the site. The mill has a capacity of 1000t/d producing separate zinc and lead concentrates. A preliminary economic assessment (PEA) report was published in November 2012.

What's included

This report contains

  • Document

    Silvertip Project zinc mine

    XLS 537.00 KB

  • Document

    Silvertip zinc mine project

    PDF 630.28 KB

Table of contents

Tables and charts

This report includes 2 images and tables including:

Images

  • Location maps: Image 1

Tables

  • Key facts: Table 1

You may be interested in

    
            
            
            
            
            
            
            
            
            
            
    

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898