Asset Report
Syama Restart gold mine
Report summary
The Syama Complex comprises the Syama Underground Mine, a sublevel cave, the Tabakoroni Open Pit Mine and several satellite open pit deposits. Syama is a large-scale operation and comprises of two separate processing plants: a 2.4Mtpa sulphide processing circuit (ore sourced from the Syama Underground Mine) and a 1.5Mtpa oxide processing circuit (ore sourced from the Tabakoroni Open Pit Mine and the satellite deposits). In June 2019, the Company achieved commercial production rates at the automated Syama Underground Mine. By the end of May 2020, the first phase of operations at the Tabakoroni Open Pit Mine mining was completed. In April 2019, Resolute announced an updated Mineral Resource for Tabakoroni including a maiden Underground Mineral Resource and subsequently, a Pre-Feasibility Study (PFS) was commenced in FY 2019 for the development of a new underground mine. The results of the Tabakoroni Underground PFS were published in October 2020.
Table of contents
- Summary
- Key issues
- Mining
- Processing
Tables and charts
This report includes 1 images and tables including:
- Detailed map
What's included
This report contains:
Other reports you may be interested in
Asset Report
Montana Tunnels Restart gold mine
A detailed analysis of the Montana Tunnels Restart gold mine.
$2,250
Asset Report
Edna May (Westonia Restart) gold mine
A detailed analysis of the Edna May (Westonia Restart) gold mine.
$2,250
Asset Report
Matilda (Wiluna Restart) gold mine
A detailed analysis of the Matilda (Wiluna Restart) gold mine.
$2,250