Asset Report

Syama Restart gold mine

Get this report

$2,250

You can pay by card or invoice

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders
- Find out more about subscriptions

The Syama Complex comprises the Syama Underground Mine, a sublevel cave, the Tabakoroni Open Pit Mine and several satellite open pit deposits. Syama is a large-scale operation and comprises of two separate processing plants: a 2.4Mtpa sulphide processing circuit (ore sourced from the Syama Underground Mine) and a 1.5Mtpa oxide processing circuit (ore sourced from the Tabakoroni Open Pit Mine and the satellite deposits). In June 2019, the Company achieved commercial production rates at the automated Syama Underground Mine. By the end of May 2020, the first phase of operations at the Tabakoroni Open Pit Mine mining was completed. In April 2019, Resolute announced an updated Mineral Resource for Tabakoroni including a maiden Underground Mineral Resource and subsequently, a Pre-Feasibility Study (PFS) was commenced in FY 2019 for the development of a new underground mine. The results of the Tabakoroni Underground PFS were published in October 2020.

Table of contents

  • Summary
  • Key issues
  • Mining
  • Processing

Tables and charts

This report includes 1 images and tables including:

  • Detailed map

What's included

This report contains:

  • Document

    Syama Restart gold mine

    XLS 129.50 KB

  • Document

    Syama Restart gold mine

    PDF 1.22 MB

  • Document

    Syama Restart gold mine

    ZIP 1.00 MB