Report summary

The Sissingue project (formerly Tengrela project) comprises the Sissingue Kanakono and Podio deposits with initial production from the Sissingue deposit. Based on a revised Feasibility Study completed in April 2015 total gold production of 385koz is expected over a 6 year mine life (75koz/a in the first 5 years).

What's included

This report contains

  • Document

    Tengrela Project gold mine

    XLS 119.50 KB

  • Document

    Tengrela gold mine project

    PDF 497.46 KB

Table of contents

  • Key facts
  • Summary and key issues
  • Location maps
  • Participation
  • Geology
  • Operations
  • Costs
  • Fiscal and regulatory
  • Timeline

Tables and charts

This report includes 2 images and tables including:

Images

  • Detailed map

Tables

  • Key facts: Table 1

You may be interested in

Asset report

North Mara gold mine

Asset report

Buzwagi gold mine

    
            
            
            
            
            
            
            
    

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898