Asset report

Tintaya Minesite gold mine

From

$1,350.00

Get this report

From

$1,350.00

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

FAQs

Contact us

Report summary

Before closing in 2012 Tintaya was operating a 20kt/d ore concentrator supported by an open pit. It also operated a 34kt/a cathode SxEw plant until 2013 when it closed.

What's included

This report contains

  • Document

    Tintaya Minesite gold mine

    XLS 136.00 KB

  • Document

    Tintaya Minesite gold mine

    PDF 515.56 KB

Table of contents

  • Key facts
  • Summary and key issues
  • Location maps
  • Participation
  • Geology
  • Reserves & Resources
  • Infrastructure
  • Operations
  • Fiscal and regulatory
  • Costs
  • Timeline

Tables and charts

This report includes 2 images and tables including:

Images

  • Detailed map

Tables

  • Key facts: Table 1

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898