Asset report
| |
5 Pages

Tongling (Jinchang) copper refinery


Tongling (Jinchang) copper refinery

Report summary

Jinchang smelter/refinery  which was  formerly named the Tongling No.2 smelter is a subsidiary of Tongling Tongdu Tongye Stock Co., Ltd. and was constructed by Anhui Tongling Group Co., Ltd. with a designed capacity of 30 kt/a of copper blister, 30 kt/a of copper cathode. The smelter started trial operation with capacity in May 1978 and was officially put into production in January 1980. The 15t/unit anode furnace and 5kt/a of electrolytic copper production line and were commissioned at the...

What's included?

This report includes 2 file(s)

  • Tongling (Jinchang) copper refinery PDF - 693.74 KB 5 Pages, 5 Tables, 3 Figures
  • Jinchang (Tongling 2) copper refinery.xls XLS - 698.00 KB

Description

This Copper Metals Refinery report provides a detailed analysis of the cost profile, process overview, products and key issues for this asset, as well as a detailed location map.

For copper producers, advisors and financial companies, this report provides an understanding of the value and efficiency of the operation. Use this report to understand the competitive position, identify acquisition opportunities and strengthen business strategies.

Wood Mackenzie's cost methodology is the established global industry standard, relied on by the world’s leading investment banks and mining companies to make strategic, operational and investment decisions.

Our analysts are based in the markets they analyse, working with high-quality proprietary cost databases and cost curve analyses to write consistent and reliable insights. Our database includes over 2,450 asset analyses covering more than 1,000 companies worldwide.

  • Key facts
  • Summary and key issues
  • Location maps
    • Detailed map
  • Participation
  • Products
  • Costs
  • Economic assumptions

In this report there are 8 tables or charts, including:

  • Key facts
    • Key facts: Table 1
  • Summary and key issues
  • Location maps
    • Location maps: Image 1
  • Participation
    • Participation: Table 1
  • Products
    • Products: Image 1
    • Products: Table 1
  • Costs
    • Costs: Image 1
    • Costs: Table 1
  • Economic assumptions
    • Economic assumptions: Table 1
Requester's name : .............
Department : .............
Authoriser's Name : .............
Authoriser's signature : .............
Date : .............
Cost Centre : .............

Questions about this report?

Frequently Asked Questions

Mailenquiries@woodmac.com
  • Europe: +44 131 243 4699
  • Americas: +1 713 470 1900
  • Asia Pacific: +61 2 8224 8898
contact us

Why Wood Mackenzie?

As the trusted source of commercial intelligence for the world's natural resources sector for more than 40 years, we empower clients to make better strategic decisions with objective analysis and advice. Find out more...