Asset report

Tongon gold mine project

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

Submit your details to receive further information about this report.

  • An error has occurred while getting captcha image

Report summary

Tongon is an open pit operation that utilises conventional mining methods. The plant comprises gravity concentration, flash flotation and carbon-in-leach (CIL) circuits. Reserves are expected to be depleted by 2021. Between 2017 and 2020 the mine is expected to average around 300koz of gold output per year.

What's included

This report contains

  • Document

    Tongon gold mine project

    XLS 125.00 KB

  • Document

    Tongon gold mine project

    PDF 626.23 KB

Table of contents

Tables and charts

This report includes 2 images and tables including:

Images

  • Detailed map

Tables

  • Key facts: Table 1

You may be interested in

Asset report

Springs zinc smelter

Asset report

Tasiast gold mine

Asset report

Essakane gold mine

    
            
            
            
            
            
            
            
    

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898