Asset report

Tuticorin copper smelter

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

For further information about this report submit the form below.

Report summary

Sterlite Industries constructed a smelter at Tuticorin in Tamil Nadu and an associated ISA process refinery at Silvassa in Dadra & Nagar Haveli north of Mumbai. The refinery was completed in February 1996 but the smelter was not commissioned until October 1996 having been delayed by about one year by an enforced change of location from Ratnagiri in Maharashta to Tuticorin as a result of environmental pressure from local residents. The smelter uses the Isasmelt process as the prime smelting...

What's included

This report contains

  • Document

    Tuticorin copper smelter

    PDF 1.01 MB

  • Document

    Tuticorin copper smelter.xls

    XLS 474.00 KB

Table of contents

  • Key facts
  • Summary and key issues
  • Location maps
  • Participation
  • Process overview
  • Products
  • Costs
  • Economic assumptions

Tables and charts

This report includes 13 images and tables including:

Images

  • Detailed map
  • Flowsheet
  • Production
  • Costs: Image 1

Tables

  • Key facts: Table 1
  • Participation: Table 1
  • Feed preparation
  • Smelting process
  • Auxiliary plants
  • Products: Table 1
  • Products allocation
  • Costs: Table 1
  • Economic assumptions: Table 1

You may be interested in

    
            
            
            
            
            
            
            
    

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898