Asset report
| |
7 Pages

Varvaro (Varvarinskoye) gold mine


Varvaro (Varvarinskoye) gold mine

Report summary

Varvarinskoye is an open-pit mine that was commissioned in Q4 2007 and has been in production since Q2 2008. It  has excellent access to roads, railways and power lines which were present prior to mine development. The operation was acquired by OJSC Polymetal from Orsu Metals in November 2009 and has since been equipped with additional mine fleets to ramp up to its full ore processing capacity of 4.2Mt/a by mid-2012.

What's included?

This report includes 2 file(s)

  • Varvaro (Varvarinskoye) gold mine PDF - 791.42 KB 7 Pages, 2 Tables, 1 Figures
  • Varvaro (Varvarinskoye) gold mine XLS - 129.50 KB

Description

This Gold Metals Mine report provides a detailed analysis of the cost profile, geology, reserves and future production for this mine, as well as a detailed location map.

Gold producers, advisors and financial companies can use this report to better understand asset value and efficiency of the operation. It will also help you benchmark against similar mines, identify acquisition opportunities and examine evolving cost structures to strengthen business strategies.

Wood Mackenzie's cost methodology is the established global industry standard, relied on by the world’s leading investment banks and mining companies to make strategic, operational and investment decisions.

Our analysts are based in the markets they analyse, working with high-quality proprietary cost databases and cost curve analyses to write consistent and reliable insights. Our database includes over 2,450 asset analyses covering more than 1,000 companies worldwide.

  • Key facts
  • Summary and key issues
    • Summary
    • Varvarinskoye is an open-pit mine that was commissioned in Q4 2007 and has been in production since Q2 2008. It has excellent access to roads, railways and power lines which were present prior to mine development. The operation was acquired by OJSC Polymetal from Orsu Metals in November 2009 and has since been equipped with additional mine fleets to ramp up to its full ore processing capacity of 4.2Mt/a by mid-2012.
    • Key Issues
    • Due to a successful exploration program, the company significant increased its resource and reserve base in 2012/2013. This has resulted in a significant mine life extension (from 2021 to 2030). The accompanying analysis includes the leaching circuit continuing to 2024, mining continuing until 2028 and the final year of flotation in 2030.
  • Location maps
    • Detailed map
  • Geology
  • Reserves and resources
  • Infrastructure
  • Production
  • Costs
    • CAPEX
  • Operations
    • Mining
    • Process
  • Fiscal and regulatory
    • Royalty
  • Timeline

In this report there are 3 tables or charts, including:

  • Key facts
    • Key facts: Table 1
  • Summary and key issues
  • Location maps
    • Location maps: Image 1
  • Geology
  • Reserves and resources
    • Reserves and resources: Table 1
  • Infrastructure
  • Production
  • Costs
  • Operations
  • Fiscal and regulatory
  • Timeline
Requester's name : .............
Department : .............
Authoriser's Name : .............
Authoriser's signature : .............
Date : .............
Cost Centre : .............

Questions about this report?

Frequently Asked Questions

Mailenquiries@woodmac.com
  • Europe: +44 131 243 4699
  • Americas: +1 713 470 1900
  • Asia Pacific: +61 2 8224 8898
contact us

Why Wood Mackenzie?

As the trusted source of commercial intelligence for the world's natural resources sector for more than 40 years, we empower clients to make better strategic decisions with objective analysis and advice. Find out more...