Asset report

Wa gold mine project

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

For further information about this report submit the form below.

Report summary

A staged mining approach from a series of open pits is planned with ore production from the Kunche Bepkong and Aduane deposits in the Wa Lawra block and the Julie and Collette deposits in the Wa East block. Ore from the Wa East block will be trucked 85km to a 1.2Mt/a carbon in leach (CIL) plant at Kunche for processing. Average annual gold production is estimated at 90koz over a 7 year mine life..

What's included

This report contains

  • Document

    Wa gold mine project

    PDF 498.32 KB

  • Document

    Wa gold mine project

    XLS 120.50 KB

Table of contents

Tables and charts

This report includes 2 images and tables including:

Images

  • Detailed map

Tables

  • Key facts: Table 1

You may be interested in

Asset report

Cooke gold mine

Asset report

DBM gold mine project

    
            
            
            
            
            
            
            
    

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898