Asset Report
Wahgnion gold mine project
Report summary
Mining at the Wahgnion project will be open pit utilising conventional drill, blast and haul mining techniques. The process plant will comprise a conventional carbon-in-leach (CIL) circuit with throughput ranging from 2.2Mt/a to 2.5Mt/a. Annual gold production is estimated between 80koz-136koz and first gold pour is expected to take place in 2019. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.
Table of contents
- Summary
- Key Issues
- CAPEX
- Mining
- Processing
- Power
Tables and charts
This report includes 1 images and tables including:
What's included
This report contains:
Other reports you may be interested in
12 March 2019
Caspiche gold mine project
Asset Report
Caspiche gold mine project
A detailed analysis of the Caspiche gold mine project.
$2,25008 March 2019
Frieda River gold mine project
Asset Report
Frieda River gold mine project
A detailed analysis of the Frieda River gold mine project.
$2,25014 June 2019
Conga gold mine project
Asset Report
Conga gold mine project
A detailed production and cost competitive analysis of the Conga gold mine project.
$2,250Trusted by leading organisations