Asset Report

Wahgnion gold mine project

Get this report

$2,250

You can pay by card or invoice

Contact us

Submit your details to receive further information about this report.

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQ's about online orders
- Find out more about subscriptions

06 September 2019

Wahgnion gold mine project

Report summary

Mining at the Wahgnion project will be open pit utilising conventional drill, blast and haul mining techniques. The process plant will comprise a conventional carbon-in-leach (CIL) circuit with throughput ranging from 2.2Mt/a to 2.5Mt/a. Annual gold production is estimated between 80koz-136koz and first gold pour is expected to take place in 2019. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.

Table of contents

  • Summary
  • Key Issues
  • CAPEX
  • Mining
  • Processing
  • Power

Tables and charts

This report includes 1 images and tables including:

What's included

This report contains:

  • Document

    Wahgnion gold mine project

    XLS 118.00 KB

  • Document

    Wahgnion gold mine project

    PDF 980.23 KB

  • Document

    Wahgnion gold mine project

    ZIP 976.23 KB

Trusted by leading organisations