Asset report

Wheelarra iron ore mine

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

Submit your details to receive further information about this report.

  • An error has occurred while getting captcha image

Report summary

Wheelarra is part of BHP's Jimblebar mining hub which has been mined since 1989. Mining at Wheelarra commenced in 2004 with ore transported to Mt Whaleback for processing. Since the Jimblebar processing facility opened in Q3 2013, Wheelarra's ore has been blended and processed at the Jimblebar mine site.Ore from Wheelarra is conveyed 6 km to the Jimblebar processing hub where it undergoes primary and secondary crushing with ore from the Jimblebar mine. Production is expected to continue to increase at both sites until the tonnes mined from Wheelarra are the same as those mined from Jimblebar at 35 Mtpa each in 2020. This is key to BHP reaching its stated target of 290 Mtpa in that year.

What's included

This report contains

  • Document

    Wheelarra.xls

    XLS 217.00 KB

  • Document

    Wheelarra iron ore mine

    PDF 5.06 MB

Table of contents

Tables and charts

This report includes 13 images and tables including:

Images

  • Detailed map
  • Production: Image 1
  • Costs: Image 1

Tables

  • Key facts: Table 1
  • Participation
  • Marketable reserves (at 01/01/2017)
  • Infrastructure
  • Cash costs
  • Product quality
  • Economic assumptions
  • Production: Table 1
  • Operations: Table 1
  • Capital costs

You may be interested in

    
            
            
            
            
            
            
            
            
            
            
            
    

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898