Asset report

Xamba (Zijin) zinc smelter

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

For further information about this report submit the form below.

Report summary

Construction of the smelter started in 2005 with completion and commissioning in May 2006. Design capacity was 100kt/a slab zinc and 190kt/a sulphuric acid. The smelter uses the Jarosite residue process. Commissioning of an expansion of the smelter by 100kt/a to 200kt/a slab zinc comprising a separate plant alongside the existing smelter was completed in 2009. Most plant areas were twinned in the expansion however only one casting plant is used for both production lines.

What's included

This report contains

  • Document

    Xamba (Zijin) zinc smelter

    PDF 509.65 KB

  • Document

    Xamba (Zijin) zinc smelter.xls

    XLS 506.00 KB

Table of contents

  • Key facts
  • Summary and key issues
  • Location maps
  • Participation
  • Process overview
  • Products
  • Costs
  • Timeline
  • Economic assumptions

Tables and charts

This report includes 14 images and tables including:

Images

  • Location maps: Image 1
  • Flowsheet
  • Products: Image 1
  • Costs: Image 1

Tables

  • Key facts: Table 1
  • Participation: Table 1
  • Process overview: Table 1
  • Process overview: Table 2
  • Process overview: Table 3
  • Process overview: Table 4
  • Products: Table 1
  • Products: Table 2
  • Costs: Table 1
  • Economic assumptions: Table 1

You may be interested in

    
            
            
            
            
            
            
            
    

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898