Asset Report

Xamba (Zijin) zinc smelter

Get this report

$2,250

You can pay by card or invoice

Contact us

Submit your details to receive further information about this report.

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQ's about online orders
- Find out more about subscriptions

04 March 2020

Xamba (Zijin) zinc smelter

Report summary

Construction of the smelter started in 2005, with completion and commissioning in May 2006. Design capacity was 100kt/a slab zinc and 190kt/a sulphuric acid. The smelter uses the Jarosite residue process. Commissioning of an expansion of the smelter by 100kt/a to 200kt/a slab zinc, comprising a separate plant alongside the existing smelter was completed in 2009. Most plant areas were twinned in the expansion, however only one casting plant is used for both production lines.

Table of contents

  • Summary
  • Key issues
  • Other

Tables and charts

This report includes 7 images and tables including:

  • Detailed map
  • Flowsheet
  • Feed Preparation
  • Roaster and Acid Plant
  • Leaching and Purification
  • Tankhouse, Melting and Casting

What's included

This report contains:

  • Document

    Xamba (Zijin) zinc smelter

    PDF 1.05 MB

  • Document

    Xamba (Zijin) zinc smelter

    ZIP 1.15 MB

  • Document

    XmzjZn_Xamba (Zijin).xlsm

    XLSM 7.30 MB