Asset Report

Xing alumina refinery

Get this report

$2,250

You can pay by card or invoice

Contact us

Submit your details to receive further information about this report.

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQ's about online orders
- Find out more about subscriptions

20 June 2019

Xing alumina refinery

Report summary

The economic development of Xing county has lagged behind much of China, with poor transport infrastructure. The area was once a ‘revolution base' but by 2007, Xing was classified as a ‘State-Class Poor County'. We expect that effective capacity will be nearer 1Mt/a. The refinery has captive bauxite mines. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.

Table of contents

  • Summary
  • Key issues
  • Bauxite
  • Calcination
  • Digestion
  • Calcining
  • Environmental
  • Power

Tables and charts

This report includes 1 images and tables including:

  • Detailed map

What's included

This report contains:

  • Document

    Xing alumina refinery

    XLS 311.00 KB

  • Document

    Huanghuitou bauxite mine

    XLS 234.00 KB

  • Document

    Aojiawan bauxite mine

    XLS 234.00 KB

  • Document

    Xing alumina refinery

    ZIP 1.10 MB

  • Document

    Xing alumina refinery

    ZIP 1.10 MB

Trusted by leading organisations