Asset report

Xinxing Tiantang zinc mine

From

$1,350.00

Get this report

From

$1,350.00

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

FAQs

Contact us

Report summary

Xinxing Tiantang operation is comprised of two distinct mining and milling operations for both Zn/Pb and Cu each having separate mines and mills. This profile only includes the Zn/Pb operation only and no by product credits are given from the copper operation as operating costs are not shared. The Zn/Pb operation has a capacity of 400kt/a and commenced in early 2014.

What's included

This report contains

  • Document

    Xinxing Tiantang zinc mine

    XLS 539.50 KB

  • Document

    Xinxing Tiantang zinc mine

    PDF 580.80 KB

Table of contents

  • Key facts
  • Summary and key issues
  • Location maps
  • Participation
  • Geology
  • Operations
  • Timeline

Tables and charts

This report includes 2 images and tables including:

Images

  • Location maps: Image 1

Tables

  • Key facts: Table 1

You may be interested in?

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898