Asset report

Yuanjiang nickel operation

From

$1,350.00

Get this report

From

$1,350.00

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

FAQs

Contact us

Report summary

The mine started a pilot plant in 2001 with production less than 50t/a. In February 2005 the operation was merged with YunXi Group and the pilot plant was expanded into a commercial operation in 2006. The mine is a laterite nickel producer.

What's included

This report contains

  • Document

    Yuanjiang Nickel Mine nickel operation

    XLS 264.00 KB

  • Document

    Yuanjiang nickel operation

    PDF 533.62 KB

Table of contents

  • Key facts
  • Summary and key issues
  • Location maps
  • Operations
  • Timeline

Tables and charts

This report includes 2 images and tables including:

Images

  • Detailed map

Tables

  • Key facts: Table 1

You may be interested in?

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898