Insight
SMUD’s building electrification strategy: A grid edge case study
Report summary
The case study explores the unique approach that Sacramento Municipal Utility District (SMUD) has adopted to electrify and decarbonize existing and new buildings in its service area, highlighting the takeaways this strategy offers to power and natural gas distributors, as well as regulators and technology providers, in the US and abroad. The case study also compares SMUD’s experience with the most important building electrification initiatives currently in progress in California, New York and New England, and provides insights on the status of and outlook for the heat pump technology sector.
Table of contents
- No table of contents specified
Tables and charts
No table or charts specified
What's included
This report contains:
Other reports you may be interested in
Asset Report
Assarel copper mine
A detailed analysis of the Assarel copper mine.
$2,250
Asset Report
Hoyle Pond (to 2002) (Closed) gold mine
A detailed analysis of the Hoyle Pond (to 2002) (Closed) gold mine.
$2,250
Asset Report
Colomac (Closed) gold mine
A detailed analysis of the Colomac (Closed) gold mine.
$2,250