Inform

Utility sponsors abandon V. C. Summer Nuclear Expansion

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

Contact us about this report

Report summary

On July 31 the utility sponsors South Carolina Electric & Gas (SCE&G) and Santee Cooper decided to discontinue construction of two new units at the V.C. Summer Nuclear Station and plan to abandon the project. Cancellation of the project will dramatically alter the future generating mix in South Carolina creating opportunities for both gas fired generation and solar to meet long term supply needs especially under any sort of long term decarbonization scenario.

What's included

This report contains

  • Document

    Utility sponsors abandon V. C. Summer Nuclear Expansion

    PDF 996.85 KB

Table of contents

Tables and charts

This report includes 1 images and tables including:

Images

  • South Carolina Zone forecast annual Generation and CO2 emissions (with V.C. Summer 2-3)

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898