Asset report

A/6-F/3 Pipeline (D)

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

For further information about this report submit the form below.

Report summary

The A/6 F/3 gas gathering system was built to transport gas from the German A/6 B/4 gas field and other potential developments in the far north of the Dutch sector. In addition to the gas pipeline a condensate pipeline has also been constructed and both pipelines were commissioned in September 2000. The pipelines terminate at the F/3 FB platform 118 kilometres southeast in the Dutch Sector. F/3 FB is the start of the NOGAT gas pipeline which transports gas onwards to the Den Helder ...

What's included

This report contains

  • Document

    A/6-F/3 Pipeline (D)

    PDF 391.81 KB

  • Document

    A/6-F/3 Pipeline (D)

    XLS 140.50 KB

  • Document

    A/6-F/3 Pipeline (D)

    ZIP 498.65 KB

Table of contents

  • Key facts
  • Summary
  • Location maps
  • Participation
  • Development
  • Throughput
  • Costs
  • Economic assumptions

Tables and charts

This report includes 5 images and tables including:

Images

  • Index Map
  • Gas Throughput Profile

Tables

  • Key facts: Table 1
  • Participation: Table 1
  • Throughput: Table 1

You may be interested in

    
            
            
            
            
            
            
            
    

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898