Asset Report

A/6-F/3 Pipeline (D)

Get this report

$2,600

You can pay by card or invoice

Contact us

Submit your details to receive further information about this report.

For details on how your data is used and stored, see our Privacy Notice.
 

- Available as part of a subscription
- FAQ's about online orders

01 January 2017

A/6-F/3 Pipeline (D)

Report summary

The A/6-F/3 gas gathering system was built to transport gas from the German A/6-B/4 gas field and other potential developments in the far north of the Dutch sector. In addition to the gas pipeline, a condensate pipeline has also been constructed, and both pipelines were commissioned in September 2000. The pipelines terminate at the F/3-FB platform, 118 kilometres southeast in the Dutch Sector. F/3-FB is the start of the NOGAT gas pipeline, which transports gas onwards to the Den Helder ...

Table of contents

  • Key facts
  • Summary
  • Location maps
  • Participation
    • Pipelines
    • Terminal
  • Throughput
    • Tariffs
  • Economic assumptions

Tables and charts

This report includes 5 images and tables including:

  • Key facts: Table 1
  • Index Map
  • Participation: Table 1
  • Gas Throughput Profile
  • Throughput: Table 1

What's included

This report contains:

  • Document

    A/6-F/3 Pipeline (D)

    PDF 311.71 KB

  • Document

    A/6-F/3 Pipeline (D)

    XLS 140.50 KB

  • Document

    A/6-F/3 Pipeline (D)

    ZIP 409.97 KB

Other reports you may be interested in

Browse reports by Industry Sector