Asset report

Akacias

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

Contact us about this report

Report summary

The Akacias field was brought onstream in late 2010 although it was not declared commercial until 2014. It produced under an exploration license until 2015 when the operators acquired a development license. In early 2016 the field was temporarily shut in due to the low oil price.The field is a westerly extension of and on trend with Ecopetrol's Chichimene field. Akacias lies within the CPO 9 block. The partners have identified several additional targets including Lorito NE and Colibri which could ultimately yield up to 500 mmbbl of reserves. Community relations issues have slowed progress. Given the prospectivity of the block and the proximity of these other prospects to Akacias the block infrastructure can be expanded to accommodate new discoveries if needed.

What's included

This report contains

  • Document

    Akacias

    PDF 7.20 MB

  • Document

    Akacias

    XLS 514.50 KB

  • Document

    Akacias

    ZIP 7.64 MB

Table of contents

  • Key facts
  • Summary and key issues
  • Location maps
  • Participation
  • Geology
  • Well data
  • Exploration
  • Reserves and resources
  • Production
  • Development
  • Infrastructure
  • Costs
  • Sales contracts
  • Fiscal and regulatory
  • Economic assumptions
  • Economic analysis

Tables and charts

This report includes 21 images and tables including:

Images

  • Index Map
  • Detail Map
  • Production Profile
  • Split of Revenues
  • Cumulative Net Cash Flow - Undiscounted
  • Cumulative Net Cash Flow - Discounted at 10% from 01/01/2018
  • Remaining Revenue Distribution (Discounted at 10% from 01/01/2018)
  • Remaining PV Price Sensitivities

Tables

  • Key facts: Table 1
  • Geology: Table 1
  • Well data: Table 1
  • Reserves and resources: Table 1
  • Reserves and resources: Table 2
  • Production: Table 1
  • Production: Table 2
  • Cash flow
  • Economic analysis: Table 2
  • Participation: Table 1
  • Costs: Table 1
  • Costs: Table 2
  • Costs: Table 3

You may be interested in

Asset report

Rincon del Mangrullo

Asset report

Rio Neuquen

Asset report

Cuenca Marina Austral

    
            
            
            
            
            
            
            
    

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898