Asset Report

Bacton (Eni)

Get this report

$1,700

You can pay by card or invoice

Contact us

Submit your details to receive further information about this report.

For details on how your data is used and stored, see our Privacy Notice.
 

- Available as part of a subscription
- FAQ's about online orders

01 November 2017

Bacton (Eni)

Report summary

The Bacton gas terminal is located on the Norfolk coast 32 kilometres north of Great Yarmouth. The site consists of four terminals. Perenco, Shell and Eni each operate separate gas reception and processing facilities. There is also a Transco Entry Facility which receives the treated gas. It also provides a direct link to the UK - Continent Interconnector.The Eni terminal facility has three reception points. These points accept gas from the Hewett System, the Thames Area System and the ...

Table of contents

  • Key facts
  • Summary
  • Location maps
  • Participation
    • Terminal
    • Pipelines
      • Hewett System
      • Thames Area System
      • Lancelot System
    • Terminal

Tables and charts

This report includes 11 images and tables including:

  • Key facts: Table 1
  • Bacton (Eni) Map
  • Participation: Table 1
  • Bacton (Eni) Gas Throughput Profile
  • Throughput: Table 1
  • Throughput: Table 2
  • Development: Image 1
  • Development: Table 1
  • Development: Table 2
  • Development: Image 2
  • Development: Table 3

What's included

This report contains:

  • Document

    Bacton (Eni)

    PDF 333.57 KB

  • Document

    Bacton (Eni)

    XLS 336.00 KB

  • Document

    Bacton (Eni)

    ZIP 605.46 KB

Other reports you may be interested in

Browse reports by Industry Sector