Asset report

Bacton (Eni)

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

Contact us about this report

Report summary

The Bacton gas terminal is located on the Norfolk coast 32 kilometres north of Great Yarmouth. The site consists of four terminals. Perenco Shell and Eni each operate separate gas reception and processing facilities. There is also a Transco Entry Facility which receives the treated gas. It also provides a direct link to the UK Continent Interconnector.The Eni terminal facility has three reception points. These points accept gas from the Hewett System the Thames Area System and the ...

What's included

This report contains

  • Document

    Bacton (Eni)

    PDF 413.67 KB

  • Document

    Bacton (Eni)

    XLS 336.00 KB

  • Document

    Bacton (Eni)

    ZIP 694.18 KB

Table of contents

  • Key facts
  • Summary
  • Location maps
  • Participation
  • Development
  • Throughput

Tables and charts

This report includes 11 images and tables including:

Images

  • Bacton (Eni) Map
  • Bacton (Eni) Gas Throughput Profile
  • Development: Image 1
  • Development: Image 2

Tables

  • Key facts: Table 1
  • Participation: Table 1
  • Throughput: Table 1
  • Throughput: Table 2
  • Development: Table 1
  • Development: Table 2
  • Development: Table 3

You may be interested in

    
            
            
            
            
            
            
            
    

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898