Asset Report

Badr El Din

From

$1,700.00

You can pay by card or invoice

From

$1,700.00

You can pay by card or invoice

Get this Asset Report as part of a subscription

Enquire about subscriptions

Already have a subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

Submit your details to receive further information about this report.

  • An error has occurred while getting captcha image
For details on how your data is used and stored, see our Privacy Notice.
 

Report summary

The Badr El Din acreage is located in the Abu Gharadig Basin of the Western Desert, northwest of the Abu Al Gharadig field and 300 kilometres west of Cairo. Shell was awarded the exploration contract in 1980 and made ten discoveries between 1982 and 1991.BED 1 production commenced in 1983 under the operatorship of the newly formed Badr Petroleum Company (Bapetco) joint venture. In 1990, gas production was increased significantly when BED 3 was brought onstream and this was followed by BED 2 ...

What's included

This report contains

  • Document

    Badr El Din

    PDF 4.77 MB

  • Document

    Badr El Din

    XLS 1017.00 KB

  • Document

    Badr El Din

    ZIP 5.62 MB

Table of contents

Tables and charts

This report includes 37 images and tables including:

Tables

  • Key facts: Table 1
  • Participation: Table 1
  • Participation: Table 2
  • Well data: Table 1
  • Exploration: Table 1
  • Reserves and resources: Table 1
  • Reserves and resources: Table 2
  • Infrastructure: Table 1
  • Costs: Table 1
  • Sales contracts: Table 1
  • Cash Flow
  • Economic analysis: Table 2
  • Economic analysis: Table 3
  • Economic analysis: Table 4
  • Economic analysis: Table 5
  • Economic analysis: Table 6
  • Economic analysis: Table 7
  • Production: Table 1
  • Production: Table 2
  • Costs: Table 2
  • Costs: Table 3
  • Costs: Table 4
  • Costs: Table 5

Images

  • Index Map
  • Badr El Din (West) Area Map
  • Split of Revenues
  • Cumulative Net Cash Flow - Undiscounted
  • Cumulative Net Cash Flow - Discounted at 10% from 01/01/2018
  • Remaining Revenue Distribution (Discounted at 10% from 01/01/2018)
  • Remaining Present Value Price Sensitivities
  • Split of Revenues
  • Cumulative Net Cash Flow - Undiscounted
  • Cumulative Net Cash Flow - Discounted at 10% from 01/01/2018
  • Remaining Revenue Distribution (Discounted at 10% from 01/01/2018)
  • Remaining PV Price Sensitivities
  • Production Profile
  • Production Profile

You may be interested in

Asset Report

West Sitra

Asset Report

GPC Fields

Asset Report

Alam El Shawish West

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898