Asset Report

Block 15 Kizomba B

From

$1,700.00

You can pay by card or invoice

From

$1,700.00

You can pay by card or invoice

Get this Asset Report as part of a subscription

Enquire about subscriptions

Already have a subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

Submit your details to receive further information about this report.

For details on how your data is used and stored, see our Privacy Notice.
 

Report summary

Block 15 is a deepwater block located 120 kilometres offshore Angola in the Lower Congo Basin. The Kizomba B development area was sanctioned in 2003 and exploits the Dikanza and Kissanje fields. It was the third development on the block after Xikomba and Kizomba A. The fields were developed using a tension leg platform (TLP) tied back to a floating production, storage and offloading vessel (FPSO)..

What's included

This report contains

  • Document

    Block 15 Kizomba B

    PDF 5.02 MB

  • Document

    Block 15 Kizomba B

    XLS 609.50 KB

  • Document

    Block 15 Kizomba B

    ZIP 5.52 MB

Table of contents

  • Key facts
    • Summary
    • Key issues
  • Location maps
  • Participation
  • Geology
  • Well data
    • Seismic
  • Reserves and resources
  • Production
    • Development Overview
    • Tension Leg Platform (TLP)
    • FPSO
    • Subsea Flowlines, Umbilicals and Risers
    • Subsea Systems
    • Drilling
  • Infrastructure
    • Exploration Costs
    • Abandonment Costs
    • Capital Costs
    • Operating Costs
  • Fiscal and regulatory
    • Cash flow
    • Discount rate and date
    • Inflation rate
    • Oil price
    • Global Economic Model (GEM) File
  • Economic analysis

Tables and charts

This report includes 23 images and tables including:

Tables

  • Key facts: Table 1
  • Participation: Table 1
  • Geology: Table 1
  • Well data: Table 1
  • Reserves and resources: Table 1
  • Production: Table 1
  • Production: Table 2
  • Fiscal and regulatory: Table 1
  • Cash Flow
  • Economic analysis: Table 2
  • Economic analysis: Table 3
  • Development: Table 1
  • Costs: Table 1
  • Costs: Table 2
  • Costs: Table 3

Images

  • Index Map
  • Kizomba B Map
  • Kizomba B Production Profile
  • Split of Revenues
  • Cumulative Net Cash Flow - Undiscounted
  • Cumulative Net Cash Flow - Discounted at 10% from 01/01/2018
  • Remaining Revenue Distribution (Discounted at 10% from 01/01/2018)
  • Remaining Present Value Price Sensitivities

You may be interested in

Questions about this report?

  • Europe:
    +44 131 243 4400
  • Americas:
    +1 713 470 1600
  • Asia Pacific:
    +65 6518 0800