Asset Report

Block 15 Marimba North

From

$1,700.00

You can pay by card or invoice

From

$1,700.00

You can pay by card or invoice

Get this Asset Report as part of a subscription

Enquire about subscriptions

Already have a subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

Submit your details to receive further information about this report.

  • An error has occurred while getting captcha image
For details on how your data is used and stored, see our Privacy Notice.
 

Report summary

Block 15 is a deepwater block located 120 kilometres offshore Angola in the Lower Congo Basin. ExxonMobil was awarded the block in 1992. There are two separate accumulations within the Block 15 Marimba development licence: Marimba North and Marimba South. This analysis refers to the Marimba North field. Marimba South is classified as a contingent technical reserve and is discussed in the Block 15 Kizomba Satellites Phase 2 analysis.In September 2005, Sonangol approved the development plan ...

What's included

This report contains

  • Document

    Block 15 Marimba North

    PDF 5.07 MB

  • Document

    Block 15 Marimba North

    XLS 559.50 KB

  • Document

    Block 15 Marimba North

    ZIP 5.53 MB

Table of contents

  • Key facts
    • Summary
    • Key issues
  • Location maps
  • Participation
  • Geology
  • Well data
    • Seismic
    • Drilling
  • Reserves and resources
  • Production
  • Development
  • Infrastructure
    • Exploration Costs
    • Capital Costs
    • Abandonment Costs
    • Operating Costs
  • Fiscal and regulatory
    • Cash flow
    • Discount rate and date
    • Inflation rate
    • Oil price
    • Global Economic Model (GEM) File
  • Economic analysis

Tables and charts

This report includes 22 images and tables including:

Tables

  • Key facts: Table 1
  • Participation: Table 1
  • Geology: Table 1
  • Well data: Table 1
  • Reserves and resources: Table 1
  • Production: Table 1
  • Production: Table 2
  • Fiscal and regulatory: Table 1
  • Cash Flow
  • Economic analysis: Table 2
  • Economic analysis: Table 3
  • Costs: Table 1
  • Costs: Table 2
  • Costs: Table 3

Images

  • Index Map
  • Block 15 Marimba Map
  • Marimba North Production Profile
  • Split of Revenues
  • Cumulative Net Cash Flow - Undiscounted
  • Cumulative Net Cash Flow - Discounted at 10% from 01/01/2018
  • Remaining Revenue Distribution (Discounted at 10% from 01/01/2018)
  • Remaining PV Price Sensitivities

You may be interested in

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898