Asset report

Brynhild

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about subscriptions

Already have subscription? Sign In

Further information

Contact us

Submit your details to receive further information about this report.

  • An error has occurred while getting captcha image
For details on how your data is used and stored, see our Privacy Notice.
 

Report summary

Brynhild (formerly Nemo) is a small oil field north of the Ula field, close to the UK sector in the Norwegian Central North Sea. The field is borderline high-pressure and high-temperature (HPHT). The field is developed using the Haewene Brim Floating Production, Storage and Offloading (FPSO) vessel at the Pierce field in the UK sector. Production is via four long horizontal subsea wells: two producers and two injectors. Oil is exported via tanker loading from the FPSO.Technical difficulties ...

What's included

This report contains

  • Document

    Brynhild

    PDF 4.48 MB

  • Document

    Brynhild

    XLS 656.50 KB

  • Document

    Brynhild

    ZIP 5.02 MB

Table of contents

  • Key facts
    • Summary
    • Key issues
  • Location maps
    • Historic licensing and corporate activity
  • Geology
  • Well data
  • Exploration
  • Reserves and resources
  • Production
  • Development
  • Infrastructure
    • Capital Costs
    • Decommissioning costs
    • Operating Costs
  • Fiscal and regulatory
    • Cash Flow
    • Discount rate and date
    • Inflation rate
    • Oil price
    • Carbon price
    • Exchange rate
    • Fiscal terms
    • Global Economic Model (GEM) file
  • Economic analysis

Tables and charts

This report includes 24 images and tables including:

Images

  • Index Map
  • Detail Map
  • Brynhild Production Profile
  • Split of Revenues
  • Cumulative Net Cash Flow - Undiscounted
  • Cumulative Net Cash Flow - Discounted at 10% from 01/01/2018
  • Remaining Revenue Distribution (Discounted at 10% from 01/01/2018)
  • Remaining PV Price Sensitivities

Tables

  • Key facts: Table 1
  • Participation: Table 1
  • Geology: Table 1
  • Well data: Table 1
  • Reserves and resources: Table 1
  • Production: Table 1
  • Production: Table 2
  • Cash flow
  • Economic analysis: Table 2
  • Economic analysis: Table 3
  • Economic analysis: Table 4
  • Economic analysis: Table 5
  • Economic analysis: Table 6
  • Costs: Table 1
  • Costs: Table 2
  • Costs: Table 3

You may be interested in

Asset report

Lelyaki

Asset report

Brasse

    
            
            
            
            
            
            
            
    

Questions about this report?

    • Europe:
      +44 131 243 4699
    • Americas:
      +1 713 470 1900
    • Asia Pacific:
      +61 2 8224 8898