Asset Report
Cooper Basin
Report summary
The Cooper Basin Project consists of over two hundred onshore oil and gas fields located in the Cooper/Eromanga Basin. The project straddles the South Australia and Queensland state borders in central Australia. This analysis details the fields in the two main Cooper Basin Joint Ventures - the South Australian Cooper Basin JV (SACBJV) and the Southwest Queensland JV (SWQJV) - both of which are operated by Santos.
Table of contents
- Key facts
-
Summary and key issues
- Summary
- Key issues
- Location maps
-
Participation
-
South Australia
- Upstream
- Downstream
-
Queensland
- Upstream
-
South Australia
-
Exploration
-
South Australia
- 2000-2009
- 2010-Present
-
Queensland
- 2000-2009
- 2010-Present
-
South Australia
-
Reserves and resources
- Reserves
- Contingent Resources
-
Production
-
South Australia
- Gas
- Liquids
-
Queensland
- Gas
- Liquids
-
South Australia
-
Development
- Key development metrics
-
Infrastructure
- South Australia
- Queensland
-
Costs
- Exploration Costs
-
Capital Costs
- Pre-2000
- 2000-2019
- Post-2020 costs
- South Australia
- Queensland
- Operating Costs
-
Sales contracts
-
Current gas contracts
- Santos
- Beach Energy
- Lattice Energy contracts
- Uncontracted Gas
- Ethane - New South Wales - Qenos
-
Current gas contracts
-
Fiscal and regulatory
- Onshore PRRT
- Corporate income tax
- Royalty
-
Economic assumptions
- Cash flow
- Discount rate and date
- Inflation rate
- Oil price
- Exchange rate
- Global Economic Model (GEM) file
- Economic analysis
Tables and charts
This report includes 36 images and tables including:
- Key facts: Table 1
- Index Map: Cooper Basin
- Map A - Cooper Basin - South Australia
- Map B - Cooper Basin - South Australia
- Map C - Cooper Basin - Queensland
- Map D - Cooper Basin - Queensland
- Participation: Table 1
- Participation: Table 2
- Infrastructure: Image 1
- Cash Flow
- Economic analysis: Table 2
- Economic analysis: Table 3
- Split of Revenues
- Cumulative Net Cash Flow - Undiscounted
- Cumulative Net Cash Flow - Discounted at 10% from 01/01/2024
- Remaining Present Value Price Sensitivities
- Reserves and resources: Table 1
- Reserves and resources: Table 2
- Infrastructure: Table 1
- Costs: Table 1
- Costs: Table 6
- Fiscal and regulatory: Table 1
- Production: Table 1
- Production: Table 2
- Cooper Basin: South Australia JV Production Profile
- Production: Table 3
- Production: Table 4
- Cooper Basin: Queensland JV Production Profile
- Costs: Table 2
- Costs: Table 3
- Costs: Table 4
- Costs: Table 5
- Sales contracts: Table 1
- Sales contracts: Table 2
- Sales contracts: Table 3
- Sales contracts: Table 4
What's included
This report contains:
Other reports you may be interested in
Asset Report
PEL 104 and PEL 111
PEL 104 and 111 is an oil development located on the northwestern flank of South Australia's Cooper/Eromanga Basin.
$3,100
Asset Report
PEL 106 B
The PEL 106 B fields are located in the western Cooper/Eromanga Basin, approximately 50 kilometres west-northwest of Moomba.
$3,100
Asset Report
PEL 91
PEL 91 is an oil development located on the western flank of South Australia's Cooper/Eromanga Basin.
$3,100