Asset report

Easington Catchment Area

From

$1,700.00

Get this report

From

$1,700.00

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

FAQs

Contact us

Report summary

The Easington Catchment Area (ECA) project has been developed in two phases. The first phase included the development of the Neptune and Mercury gas fields. The Mercury field has been developed as a two well subsea tie back to a platform on the Neptune field. Neptune is tied back to the ECA riser tower bridge linked to the Cleeton platform to the north. The second phase of the ECA project covered the development of the Apollo Minerva Whittle and Wollaston fields. Apollo and Minerva ...

What's included

This report contains

  • Document

    Easington Catchment Area

    PDF 630.34 KB

  • Document

    Easington Catchment Area

    XLS 967.50 KB

  • Document

    Easington Catchment Area

    ZIP 1.44 MB

Table of contents

  • Key facts
  • Summary and key issues
  • Location maps
  • Participation
  • Geology
  • Well data
  • Reserves and resources
  • Production
  • Development
  • Infrastructure
  • Costs
  • Sales contracts
  • Fiscal and regulatory
  • Economic assumptions
  • Economic analysis

Tables and charts

This report includes 31 images and tables including:

Images

  • Index Map
  • Easington Catchment Area Map
  • ECA Production Profile
  • Split of Revenues
  • Cumulative Net Cash Flow - Undiscounted
  • Cumulative Net Cash Flow - Discounted at 10% from 01/01/2017
  • Remaining Present Value Price Sensitivities

Tables

  • Key facts: Table 1
  • Participation: Table 1
  • Geology: Table 1
  • Well data: Table 1
  • Well data: Table 2
  • Well data: Table 3
  • Reserves and resources: Table 1
  • Production: Table 1
  • Production: Table 2
  • Infrastructure: Table 1
  • Development: Table 1
  • Costs: Table 7
  • Cash Flow (US$ million)
  • Economic analysis: Table 2
  • Economic analysis: Table 3
  • Cash Flow (£ million)
  • Economic analysis: Table 5
  • Economic analysis: Table 6
  • Costs: Table 1
  • Costs: Table 2
  • Costs: Table 3
  • Costs: Table 4
  • Costs: Table 5
  • Costs: Table 6

You may be interested in?

Asset report

Helvellyn

Asset report

Amethyst

Asset report

Causeway Area

    
            
            
            
            
            
            
            
            
    

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898