Asset Report

East Al Hajr (Block 51)

Get this report

$2,300

You can pay by card or invoice

Contact us

Submit your details to receive further information about this report.

For details on how your data is used and stored, see our Privacy Notice.
 

- Available as part of a subscription
- FAQ's about online orders

15 December 2016

East Al Hajr (Block 51)

Report summary

The East Al Hajr contract area lies within the Say'un-Al Masila Basin, a proven oil producing area which contains the prolific Masila fields. East Al Hajr's only successful exploration wells, BAK-A-1 and BAK-B-1, were drilled in 2003 and both tested oil from the Qishn and Saar horizons. The BAK-A and BAK-B fields are extensions of the Heijah and Tawila fields, which lie in the adjacent Masila block.Nexen suspended operations and evacuated staff in December 2014, citing an increased ...

Table of contents

  • Key facts
    • Summary
    • Key issues
      • Issues common to the Masila Fields, Central Yemen
      • Issues specific to East Al Hajr (Block 51)
  • Location maps
  • Participation
  • Geology
  • Well data
    • Early exploration (1998-2001)
    • 2003 - Present
  • Reserves and resources
  • Production
  • Development
  • Infrastructure
    • Exploration Costs
    • Capital Costs
    • Operating Costs
    • Royalty
    • Cost Oil
    • Profit Oil
    • State Carried-Interest
    • Income Tax
    • Bonuses
      • Signature Bonuses
      • Production Bonuses
    • Gas
    • Cash Flow
    • Discount rate and date
    • Inflation rate
    • Oil price
    • Global Economic Model (GEM) File
  • Economic analysis

Tables and charts

This report includes 19 images and tables including:

  • Key facts: Table 1
  • Index Map
  • East Al Hajr (Block 51) Map
  • Participation: Table 1
  • Well data: Table 1
  • Reserves and resources: Table 1
  • Production: Table 1
  • Production: Table 2
  • Production Profile
  • Cash Flow
  • Economic analysis: Table 2
  • Economic analysis: Table 3
  • Split of Revenues
  • Cumulative Net Cash Flow - Undiscounted
  • Cumulative Net Cash Flow - Discounted at 10% from 01/01/2018
  • Costs: Table 1
  • Costs: Table 2
  • Costs: Table 3
  • Costs: Table 4

What's included

This report contains:

  • Document

    East Al Hajr (Block 51)

    PDF 3.36 MB

  • Document

    East Al Hajr (Block 51)

    XLS 530.50 KB

  • Document

    East Al Hajr (Block 51)

    ZIP 3.77 MB

Other reports you may be interested in

Browse reports by Industry Sector