Asset report

East Bahariya

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

Contact us about this report

Report summary

The East Bahariya block is located in the Western Desert around 170 kilometres south west of Cairo. Apache made its first discovery on the block with the Karama field in February 2000 and began production in March 2001. Apache has explored the block aggressively and successfully since making a further 32 discoveries. Field sizes are usually small ranging from two to ten million barrels. The fields are grouped into six main areas; Karama West Karama Main Asala Ridge Yomna Neama and ...

What's included

This report contains

  • Document

    East Bahariya

    PDF 4.81 MB

  • Document

    East Bahariya

    XLS 811.50 KB

  • Document

    East Bahariya

    ZIP 5.50 MB

Table of contents

  • Key facts
  • Summary and key issues
  • Location maps
  • Participation
  • Well data
  • Exploration
  • Reserves and resources
  • Production
  • Development
  • Infrastructure
  • Costs
  • Fiscal and regulatory
  • Economic assumptions
  • Economic analysis

Tables and charts

This report includes 27 images and tables including:

Images

  • Index Map
  • East Bahariya Map
  • Production Profile
  • Split of Revenues
  • Cumulative Net Cash Flow - Undiscounted
  • Cumulative Net Cash Flow - Discounted at 10% from 01/01/2018
  • Remaining Revenue Distribution (Discounted at 10% from 01/01/2018)
  • Remaining Present Value Price Sensitivities

Tables

  • Key facts: Table 1
  • Participation: Table 1
  • Well data: Table 1
  • Commitments
  • Reserves and resources: Table 1
  • Production: Table 1
  • Production: Table 2
  • Infrastructure: Table 1
  • Cash Flow
  • Economic analysis: Table 2
  • Economic analysis: Table 3
  • Costs: Table 1
  • Costs: Table 2
  • Costs: Table 3
  • Costs: Table 4
  • Fiscal and regulatory: Table 1
  • Fiscal and regulatory: Table 2
  • Fiscal and regulatory: Table 3
  • Exploration: Table 2

You may be interested in

Asset report

West El Manzala

Asset report

Chouech Es Saida

    
            
            
            
            
            
            
            
    

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898