Asset report

Eider

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

Submit your details to receive further information about this report.

  • An error has occurred while getting captcha image

Report summary

The Eider field is located around 13 kilometres north of the Cormorant field in the Northern North Sea. The oil field has been developed using a single, steel manned platform and the development involves extensive use of facilities on the Cormorant and Tern platforms.Following initial separation, production is exported via a 12-inch diameter pipeline for processing on the North Cormorant platform. Onward transportation is via the Brent pipeline system to the Sullom Voe Terminal. Eider is ...

What's included

This report contains

  • Document

    Eider

    PDF 3.89 MB

  • Document

    Eider

    XLS 765.00 KB

  • Document

    Eider

    ZIP 4.53 MB

Table of contents

  • Key facts
    • Summary
    • Key issues
  • Location maps
  • Participation
  • Geology
  • Well data
  • Exploration
  • Reserves and resources
  • Production
    • Development Drilling
    • Enhanced Recovery
    • 'Lighthouse' Operation
  • Infrastructure
    • Capital Costs
    • Operating Costs
    • Development Approval after 1 April 1982 but prior to 15 March 1993
    • Investment Allowance
    • Cash flow
    • Discount rate and date
    • Inflation rate
    • Oil price
    • Carbon price
    • Exchange rate
    • Fiscal terms
    • Global Economic Model (GEM) file
    • Cash Flow

Tables and charts

This report includes 24 images and tables including:

Images

  • Index Map
  • Eider Map
  • Split of Revenues
  • Cumulative Net Cash Flow - Undiscounted
  • Cumulative Net Cash Flow - Discounted at 10% from 01/01/2018
  • Remaining Present Value Price Sensitivities

Tables

  • Key facts: Table 1
  • Participation: Table 1
  • Geology: Table 1
  • Well data: Table 1
  • Reserves and resources: Table 1
  • Production: Table 1
  • Production: Table 2
  • Development: Table 1
  • Infrastructure: Table 1
  • Costs: Table 1
  • Costs: Table 2
  • Costs: Table 3
  • Cash Flow (US$ million)
  • Economic analysis: Table 2
  • Economic analysis: Table 3
  • Cash Flow (£ million)
  • Economic analysis: Table 5
  • Economic analysis: Table 6

You may be interested in

Asset report

Barryroe

Asset report

Maclure

Asset report

Janice Area

    
            
            
            
            
            
            
            
            
    

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898