Asset report

El Fayrouz

From

$1,700.00

Get this report

From

$1,700.00

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

FAQs

Contact us

Report summary

IEOC (Eni) was awarded the North Sinai exploration block in 1996. The agreement was ratified and became effective on 4 June 1996 under law 76/1996. IEOC completed its six first phase commitment wells in 2000 resulting in one gas discovery El Fayrouz. The field is located onshore close to the Port Said El Arish gas pipeline.El Fayrouz was brought onstream in December 2008. Gas from El Fayrouz is tied into the Port Said El Arish gas pipeline while condensate is trucked from the fields. ...

What's included

This report contains

  • Document

    El Fayrouz

    PDF 627.85 KB

  • Document

    El Fayrouz

    XLS 691.50 KB

  • Document

    El Fayrouz

    ZIP 1.22 MB

Table of contents

  • Key facts
  • Summary and key issues
  • Location maps
  • Participation
  • Well data
  • Reserves and resources
  • Production
  • Costs
  • Sales contracts
  • Fiscal and regulatory
  • Economic assumptions
  • Economic analysis

Tables and charts

This report includes 22 images and tables including:

Images

  • Index Map
  • Detail Map
  • Production Profile
  • Split of Revenues
  • Cumulative Net Cash Flow - Undiscounted
  • Cumulative Net Cash Flow - Discounted at 10% from 01/01/2017

Tables

  • Key facts: Table 1
  • Participation: Table 1
  • Well data: Table 1
  • Reserves and resources: Table 1
  • Production: Table 1
  • Production: Table 2
  • Exploration Costs
  • Capital Costs
  • Operating Costs
  • Sales contracts: Table 1
  • Cash flow
  • Economic analysis: Table 2
  • Economic analysis: Table 3
  • Fiscal and regulatory: Table 1
  • Fiscal and regulatory: Table 2
  • Fiscal and regulatory: Table 3

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898