Asset Report

El Hajeb/Guebiba

This report is currently unavailable

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders
- Find out more about subscriptions

The Guebiba and El Hajeb oil fields are located onshore in eastern Tunisia, southwest of the town of Sfax. The fields were discovered in 1981 and were brought onstream in 1985. The fields were initially developed by Houston Oil and Minerals (HOMT) and is now operated by Thyna Production Services (TPS), a 50/50 Tunisian joint-stock company between ETAP and Panoro Energy. Initial oil production was between 200 b/d and 1,000 b/d. However, a 3D seismic survey acquired in 2000 uncovered bypassed ...

Table of contents

Tables and charts

This report includes 22 images and tables including:

  • Key facts: Table 1
  • Index map
  • El Hajeb/Guebiba map
  • Participation: Table 1
  • Well data: Table 1
  • Reserves and resources: Table 1
  • Production: Table 1
  • Production: Table 2
  • Production profile
  • Cash Flow
  • Economic analysis: Table 2
  • Economic analysis: Table 3
  • Split of Revenues
  • Cumulative Net Cash Flow - Undiscounted
  • Cumulative Net Cash Flow - Discounted at 10% from 01/01/2024
  • Remaining Revenue Distribution (Discounted at 10% from 01/01/2024)
  • Remaining PV Price Sensitivities
  • Geology: Table 1
  • Geology: Table 2
  • Costs: Table 1
  • Costs: Table 2
  • Costs: Table 3

What's included

This report contains:

  • Document

    El Hajeb/Guebiba

    PDF 5.03 MB