El Manzala (El Wastani & South Manzala)
Loading current market price
Report summary
The El Manzala PSC covers three separate development leases in the onshore Nile Delta: El Wastani and El Wastani East, located to the west of Lake Manzala; and South El Manzala, located to the south of Lake Manzala. Dana Gas has been operator of the fields since its acquisition of Centurion Energy in January 2007. Production from the El Wastani fields is processed at the 200 mmcfd El Wastani gas processing plant, which is equipped to treat wet gas.
What's included
This report contains
Table of contents
- Key facts
-
Summary and key issues
- Summary
- Key issues
- Location maps
- Participation
- Geology
- Well data
- Reserves and resources
- Production
- Infrastructure
-
Costs
- Exploration Costs
-
Capital Costs
- Abandonment Costs
- Operating Costs
- Sales contracts
-
Fiscal and regulatory
- Cost/Profit Oil
- Cost/Profit Gas
- Bonuses
-
Economic assumptions
- Cash Flow
- Gas Price
- Global Economic Model (GEM) File
- Economic analysis
Tables and charts
This report includes 25 images and tables including:
Images
- Index Map
- El Wastani and South El Manzala Map
- Production Profile
- Split of Revenues
- Cumulative Net Cash Flow - Undiscounted
- Cumulative Net Cash Flow - Discounted at 10% from 01/01/2018
- Remaining Revenue Distribution (Discounted at 10% from 01/01/2018)
- Remaining PV Price Sensitivities
Tables
- Key facts: Table 1
- Participation: Table 1
- Geology: Table 1
- Well data: Table 1
- Reserves and resources: Table 1
- Production: Table 1
- Production: Table 2
- Infrastructure: Table 1
- Sales contracts: Table 1
- Cash flow
- Economic analysis: Table 2
- Economic analysis: Table 3
- Costs: Table 1
- Costs: Table 2
- Fiscal and regulatory: Table 1
- Fiscal and regulatory: Table 2
- Fiscal and regulatory: Table 3
You may be interested in
Questions about this report?
-
Europe:+44 131 243 4699
-
Americas:+1 713 470 1900
-
Asia Pacific:+61 2 8224 8898