Asset Report

G/17d-A

Get this report

$2,300

You can pay by card or invoice

Contact us

Submit your details to receive further information about this report.

For details on how your data is used and stored, see our Privacy Notice.
 

- Available as part of a subscription
- FAQ's about online orders

01 September 2016

G/17d-A

Report summary

The G/17d-A gas field was discovered in January 2000 and a production licence for part blocks G/17c&d was awarded in November 2000. The field was a fast-track development, and was brought onstream in July 2002 with a new build wellhead production platform (WHP) and two development wells. The platform is a four-legged structure with dehydration and gas processing facilities. The jacket was installed in October 2001 and the topsides in March 2001.Platform G/17d-AP was installed adjacent ...

Table of contents

Tables and charts

This report includes 24 images and tables including:

  • Key facts: Table 1
  • Index Map
  • G/17d-A Map
  • Geology: Table 1
  • Well data: Table 1
  • Reserves and resources: Table 1
  • Production: Table 1
  • Production: Table 2
  • Production Profile G/17-A
  • Development: Table 1
  • Capital Costs
  • Costs: Table 2
  • Participation: Table 1
  • Costs: Table 3
  • Cash Flow (US$ million)
  • Economic analysis: Table 2
  • Economic analysis: Table 3
  • Split of Revenues
  • Cumulative Net Cash Flow - Undiscounted
  • Cumulative Net Cash Flow - Discounted at 10% from 01/01/2019
  • Remaining PV Price Sensitivities
  • Cash Flow ( million)
  • Economic analysis: Table 5
  • Economic analysis: Table 6

What's included

This report contains:

  • Document

    G/17d-A

    PDF 937.55 KB

  • Document

    G/17d-A

    XLS 434.50 KB

  • Document

    G/17d-A

    ZIP 886.56 KB