Hess Corporation - US Rocky Mountains
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- Key facts
-
Summary and key issues
- Summary
- Key issues
- Location maps
-
Participation
- Recent acquisitions and divestments
-
Reserves and resources
- Reserves assumptions
- Reserves methodology
- Production
- Development
- Infrastructure
- Costs
- Fiscal and regulatory
-
Economic assumptions
- Cash flow
- Discount rate and date
- Inflation rate
- Oil price
- Gas price
- NGL price
- Economic analysis
Tables and charts
This report includes 29 images and tables including:
- Key facts: Table 1
- Index Map
- Participation: Table 1
- Production: Table 1
- Production: Table 2
- Production Profile by Resource Type
- Production Profile by Play Type
- Development: Table 1
- Net Development Drilling by Resource Type (2016-2025)
- Capital costs
- Costs: Table 2
- Capital Costs by Basin 2016-2025 (US$ million)
- Operating costs
- Costs: Table 4
- Fiscal and regulatory: Table 1
- Cash flow
- Economic analysis: Table 2
- Economic analysis: Table 3
- Split of Revenues
- Cumulative Net Cash Flow - Undiscounted
- Cumulative Net Cash Flow - Discounted at 10.0% from January 2021
- Remaining Revenue Distribution (Discounted at 10.0% from January 2021)
- Remaining Present Value Sensitivities
- Reserves and resources: Table 1
- Reserves and resources: Table 2
- Remaining 2P Reserves by Resource Type (at 01/01/2021)
- Analysis results
- Remaining PV by Basin (discounted at 10% to 01/01/2021)
- Economic assumptions: Table 2
What's included
This report contains:
Other reports you may be interested in
Thacker Pass - Lithium mine project
A detailed analysis of the Thacker Pass (Lithium Nevada) lithium mineral project.
$2,250Konuto Lake (Closed) zinc mine
A detailed analysis of the Konuto Lake zinc mine.
$2,250Long Canyon gold mine
A detailed analysis of the Long Canyon gold mine.
$2,250